Work begins on the Walton Road Bridge, Oct, 2013

Construction work began in May 2013 at the Walton Road project, across from the Loop Trail parking lot at Walton Lake.  Bob Brown's crew did the fill work on the south side of Walton Rd for the realigned Loop Trail, and Schaus Vorhies Manufacturing began the preliminary bridge work on the north side of Walton Road.

The latest photos are at the bottom of the page (latest update is Nov, 23, 2013).

By December, the bridge was ready to use, after the concrete was poured and cured on south side of Walton Road.

The ground for the bridge at Walton Road was surveyed in the spring, May 18, 2013.
The ground for the bridge at Walton Road was surveyed in the spring, May 18, 2013.

Preparing the realigned Loop Trail into the parking lot - lake on the left (Oct 24).
Preparing the realigned Loop Trail into the parking lot - lake on the left (Oct 24).

Looking north towards the parking lot - lake on the right (Oct 28).
Looking north towards the parking lot - lake on the right (Oct 28).

Looking east along Walton Road - uprights were installed by Schaus Vorhies Manufacturing (Oct 29).
Looking east along Walton Road - uprights were installed by Schaus Vorhies Manufacturing (Oct 29).

Looking west along Walton Road - the Loop Trail from Pleasant Lake is in front of the truck (Oct 29).
Looking west along Walton Road - the Loop Trail from Pleasant Lake is in front of the truck (Oct 29).

Concrete for the footings is being poured (Oct 29).
Concrete for the footings is being poured (Oct 29).

The cross supports for the deck have been installed (Nov 11).
The cross supports for the deck have been installed (Mon, Nov 11).

Looking east (Wed, Nov 13, 12:23pm).
Looking east (Nov 13, 12:23pm).

Looking west (Wed, Nov 13, 3:02pm).
Looking west (Nov 13, 3:02pm).

Looking north.  Bill Pollak and Austin Troutt measuring for blocking.  (Wed, Nov 13, 3:37pm).
Looking north (Nov 13, 3:37pm).

Looking north.  Chris Hallinger is, well....  (Friday, Nov 15, 3:29pm).
Looking north (Nov 16, 3:37pm).

Looking east (Saturday, Nov 16, 11:50am).
Looking east (Nov 16, 3:37pm).

Looking west (Saturday, Nov 16, 11:53am).
Looking west (Nov 16, 3:37pm).

Looking north.  Brain Stains built the cross bracing.  (Sunday, Nov 17, 2:38pm).
Looking north (Nov 17).

Looking north.  Larry Nash and David Johnson laying down the decking.  (Sunday, Nov 17, 2:38pm).
Looking north (Nov 17, 3:37pm).

AJ and Ken Daley.  (Thur, Nov 21).
AJ and Ken Daley.  (Thur, Nov 21).

Jim Salts trimming the decking boards.  (Thur, Nov 21).
Jim Salts trimming the decking boards.  (Thur, Nov 21).

Ken and AJ putting down deck boards.  (Thur, Nov 21).
.

Partner Construction putting road stone at west end of new bridge.  (Thur, Nov 21).
Ken and AJ putting down deck boards.  (Thur, Nov 21).

Partner Construction readying for pouring concrete at east end of bridge.  (Thur, Nov 21).
Partner Construction readying for pouring concrete at east end of bridge.  (Thur, Nov 21).

First handrail up.  (Thur, Nov 21).
First handrail up.  (Thur, Nov 21).

Concrete pad at the east end of the bridge.  (Fri, Nov 22).
Concrete pad at the east end of the bridge.  (Fri, Nov 22).

Close-up.  (Fri, Nov 22).
Close-up.  (Fri, Nov 22).

Another pad will be poured on the other side of Walton Rd.  (Fri, Nov 22).
Another pad will be poured on the other side of Walton Rd.  (Fri, Nov 22).

Looking east along Walton Road.  (Sat, Nov 23).
Another pad will be poured on the other side of Walton Rd.  (Fri, Nov 22).

The railings aew almost complete.  (Sat, Nov 23).
Another pad will be poured on the other side of Walton Rd.  (Fri, Nov 22).

Looking west.  The concrete pad has to cure before the bridge will open.  (Sat, Nov 23).
Another pad will be poured on the other side of Walton Rd.  (Fri, Nov 22).

Looking north at Walton Lake.  The south pad will be poured soon.  (Sat, Nov 23).
Another pad will be poured on the other side of Walton Rd.  (Fri, Nov 22).

Return to News Page

Photos supplied by Ron Blair, Oct & Nov, 2013

Every effort is made to ensure accurate information is posted to the site. However, Jefferson County Trails Council does not warrant or guarantee the accuracy, reliability or timeliness of the content on this site or content which is referenced by or linked to this site. © 2001-2016 Jefferson County Trails Council, Fairfield, Iowa.  Updated 05-20-16

 