B Street Segment of the Loop Trail, B Street Sidewalk Extension, Pt 2 - 2009

The second section of the sidewalk was built northward from Waterworks Park to connect with the Loop Trail (the Lake-to-Lake Trail) at the intersection of Zimmerman Blvd.

Construction started in 2009, halted for the winter, and was resumed in April 2010, at the same time as work started on the third section of the sidewalk (which extended north from Zimmerman Blvd to the Railroad Trail).

Nov 09.  Preparation work for this section north of Waterworks Park entrance. (rb)
Preparation work for this section north of Waterworks Park entrance.

Nov 09.  The dirt is prepared and forms are put in place. (rb)
The dirt is prepared and forms are put in place.

Nov 09.  Concrete has been poured in this segment. (rb)
Concrete has been poured in this segment.

Nov 09.  To the right is Waterworks Park. (rb)
To the right is Waterworks Park.

Nov 2009.  John Loin is inspecting this second section of sidewalk at Waterworks Park Entrance, looking north.  (rb)
John Loin is inspecting this second section of sidewalk at Waterworks Park Entrance, looking north.

12/04/09.  Preparation is taking place on a new section further up the street.  (jfr)
Preparation is taking place.

12/04/09.  Stone is brought into the form, then tamped down.  (jfr)
Stone is brought into the form, then tamped down.

12/04/09.  Man-power and machine-power is need to smooth out the stone base.  (jfr)
Man-power and machine-power is need to smooth out the stone base.   12/04/09

12/04/09.  Two bicyclists out on this cold day.  (jfr)
Two bicyclists out on this cold day.   12/04/09

12/05/09.  The next day and the concrete truck is near to the end of its job.  (jfr)
The next day and the concrete truck is near to the end of its job.   12/05/09

12/05/09.  The red device on the right is a motorized screeder.  (jfr)
he red device on the right is a motorized screeder.   12/05/09

12/05/09.  Today's pour started where the trucks are parked.  (jfr)
Today's pour started where the trucks are parked.

12/05/09.  The last bit for this year is being poured.  (jfr)
The last bit for this year is being poured.   12/05/09

12/05/09.  John Loin uses a bull float for final smoothing.  (jfr)
John Loin uses a bull float for final smoothing.   12/05/09

12/05/09.  Finishing touches are important.  (jfr)
Finishing touches are important.   12/05/09

12/05/09.  Next it will be covered with plastic so it can set up properly in the cold.  (jfr)
Next it will be covered with plastic so it can set up properly in the cold.   12/05/09

12/05/09.  This is as far as the sidewalk will go this winter.  (jfr)
This is as far as the sidewalk will go this winter.   12/05/09

12/05/09.  In the Spring of 2010 the paving will be extended up to Zimmerman Blvd.  (jfr)
In the Spring of 2010 the paving will be extended up to Zimmerman Blvd.   12/05/09

Spring 2010.   John Loin & Co resume work on the B Street sidewalk, which is being extended further north to Zimmerman Blvd.  (rb)
John  Loin & Co resume work on the B Street sidewalk.

04/18/10.   The entrance to the trailhead parking lot is here.  (rb)
The entrance to the trailhead parking lot is here.

04/18/10.   The manhole cover and LISCO vault have to be accommodated.  (rb)
The manhole cover and LISCO vault have to be accommodated.

04/20/10.   The concrete now has set and the concrete is being scored.  (jfr)
The concrete now has set and the concrete is being scored.

04/20/10.   Scoring will allow for expansion and contraction.  (jfr)
Scoring will allow for expansion and contraction.

04/20/10.   Trying out this newest section of the sidewalk.  The final short section up to Zimmerman Blvd will be completed a little later.  (rb)
Trying out this newest section of the sidewalk. The final short section up to Zimmerman Blvd will be completed a little later.

November photos by Ron Blair, December photos by J Fitz-Randolph.

Page created 12/10/09, updated 09/01/2011, reformatted 05-20-16

Back to top

Return to
News Page

B Street Trail

2008 build

2009 build

2010-2011 build

Back to B Street

Every effort is made to ensure accurate information is posted to the site. However, Jefferson County Trails Council does not warrant or guarantee the accuracy, reliability or timeliness of the content on this site or content which is referenced by or linked to this site. © 2001-2016 Jefferson County Trails Council, Fairfield, Iowa.  Reformatted 05-20-16

 

Logo for Jefferson County Trails Council, Fairfield

 

Click the Map to enlarge: Loop Trail Map
Loop Trail Map